The soil investigation report handed to the structural engineer for your design of pile foundation objective must include the embedment duration in the piles, the advisable measurements in the pile, the Protected Doing the job load of every pile measurement, and also other facts Which may be needed for the https://johnj801ded4.wikicommunication.com/user