The 25mm thick hefty steel tube is pushed Together with the finish shut by a steel shoe. On achieving the expected driving resistance, an entire duration cage is decreased in into the tube and full of significant slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://cast-in-situ-piles52737.diowebhost.com/87519998/5-tips-about-cast-in-situ-piles-you-can-use-today