For really really hard or rock-sort soils, 50 SPT N-Vales are desirable. So, we continue to collect the SPT blows nearly preferred depth where by fifty SPT N Values are received. In the situation of the deep foundation, we look for at least a 6m depth tricky soil layer less https://timocig813hhh5.wikilinksnews.com/user