1

Advanced 400 kW Chiller Installation Achieves Fifty Thousand Pounds Annual Energy Savings and 200 Metric Tonnes CO₂ Cut

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ discharge. https://1001bookmarks.com/story20579299/advanced-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story