Installation Overview At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful execution of the project. Designed to reinforce ESG targets, the installation enhances cooling reliability while cutting overall power consumption and CO₂ discharge. https://yesbookmarks.com/story20812433/high-efficiency-400-kw-chiller-installation-achieves-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving